RA Power Solutions was informed regarding the failure of three nos Crank pin Bearings of MAN B&W 5L60MC main engine onboard a vessel near South Africa.

RA Power experienced team of technicians boarded the vessel in a short time of 18 hours of receipt of intimation regarding the problem faced by the vessel. Following jobs were executed for overhaul and replacement of crankpin bearings in order to operate the engine satisfactorily after Engine repair and Engine overhaul.

MAN B&W 5L60MC Engine Repair & Overhauling is in Process
MAN B&W 5L60MC Engine Repair & Overhauling is in Process
DESCRIPTION:

I) Inspection and overhaul of the cylinder covers including the fuel and starting valves located in the covers.

II) The cylinder covers cooling spaces were also inspected, cleaned and fitted back with new O-rings.

III) Dismounting, Inspect and overhaul of the exhaust valves, renewed the seats and grinding the valve spindles.

IV) The cylinder liners were cleaned, calibrated and honed in order to restore the liners running surfaces and remove ovality. This ensured that the piston rings perform better and this will lead to a better overall cylinder condition, compared to if honing had not been done. The cylinder liners cooling spaces were also inspected, cleaned and fitted back with new o-rings.

Inspection of Engine Spares is in Process
Inspection of Engine Spares is in Process
Inspection and Repair of Crankshaft
Inspection and Repair of Crankshaft
V) The Crank pin  bearing caps were dismounted, both top and bottom bearing shells renewed

VI) The Crankshaft Crankpin  diameter was checked for the following parameters:

a) Visual inspection to check the presence of any Bearing Line marks or rough surface.

b) All the Crankpins were calibrated for taper & ovality.

c) Hardness was checked and observed within limits.

d) MPI was done to check the presence of any crack.

e) Crankshaft all pins were polished by onsite Crankshaft Grinding Machine removing the bearing line marks and for improving the Crank pin surface finish.

Onsite Repair of Crankpin by Crankshaft Grinding Machine
Onsite Repair of Crankpin by Crankshaft Grinding Machine
VII) Adjustment of the variable injection timing (VIT)

VIII) The bearing clearances were taken using lead wire

IX) Crankshaft alignment measurement was taken with a dial gauge.

Conclusion: After replacement of Bearings & Jobs described above undertaken at the time of Engine overhaul & Bearing replacement the engine was tested on the load & performance was observed satisfactory.

Repair of Crankpin is in Process
Repair of Crankpin is in Process
Inspection of Connecting Rod on Moving Vessel
Inspection of Connecting Rod on Moving Vessel

RA Power Solutions was informed regarding the failure of three nos Crank pin Bearings of MAN B&W 5L60MC main engine onboard a vessel near South Africa. RA Power experienced team of technicians boarded the vessel in a short time of 18 hours of receipt of intimation regarding the problem faced by the vessel. Following jobs … Continue reading “Diesel Engine Overhaul | Diesel Engine Repair | Crankshaft Main Bearing Replacement”

Grinding of Crankshaft in Oman by RA Power Solutions

A vessel sailing near Oman  reported serious breakdown of auxiliary engine of Yanmar model 6N18AL. RA Power Solutions team which is always ready for emergency response left for Oman and conducted the detailed inspection of the engine. It was observed that crankpin no. 4 bearing seized resulting to the damage of CR pin no. 4. All other crankpins also developed ovality to the extent of maximum 0.20 mm.

Damaged Crankpin of Yanmar Engine
Damaged Crankpin of Yanmar Engine
Crack Detection Test of Crankpin
Crack Detection Test of Crankpin

After checking the hardness, crack and other parameters of the crankpins the grinding was started. The ship was to sail to the next port and it was decided that grinding of crankshaft is to be executed by RA Power Solutions technicians while the sailing of the vessel. RA Power Solutions having portable latest design of crankshaft grinding machine with almost no vibrations started the grinding of crankshaft while the sailing of the vessel. The 6 crankpins grinding to 0.40 mm undersized was completed in a short time of 60 hours. The repair of crankshaft was successful as the engine was put back in to operation and is performing satisfactory.

Onsite Crankpin Grinding is in Process
Onsite Crankpin Grinding is in Process

RA Power Solutions having 40 years of experience in field of crankshaft grinding has achieved many land marks and have performed more than satisfactory for the clients spread all over the world. The expert team of crankshaft grinding technicians can undertake the grinding of crankshafts up to 700 mm.

Crankpin Grinding by Onsite Crankshaft Grinding Machine
Crankpin Grinding by Onsite Crankshaft Grinding Machine

All the parameters like taper, ovality, surface finish etc. after crankshaft grinding are maintained strictly as per the manufacturer’s specifications. RA Power Solutions undertakes all the jobs related to repair, maintenance, overhauling of high capacity of diesel engines and diesel generating sets onsite all over the world.

 Only company which has undertaken repair of more than 11,000 crankshafts and is highly respected for its commitment

For more information, please email us on info@rapowersolutions.com

Onsite Crankpin Grinding is in Process
Onsite Crankpin Repair is in Process
Inspection and Grinding of Crankshaft is in Process
Inspection and Grinding of Crankshaft is in Process

A vessel sailing near Oman  reported serious breakdown of auxiliary engine of Yanmar model 6N18AL. RA Power Solutions team which is always ready for emergency response left for Oman and conducted the detailed inspection of the engine. It was observed that crankpin no. 4 bearing seized resulting to the damage of CR pin no. 4. … Continue reading “Grinding of Crankshaft in Oman by RA Power Solutions”